Ways to begin

A first step that is small, and safe because it is standard.

Start with the data you already have, against a scope you can describe in a sentence. A well-developed, structured process — a defined range, a fixed build method and published standard lead times — means the first installation stands up to a date rather than to an estimate — and expands only where the record says it is worth expanding.

One controlled point

acuitystore® ONE

One point, one applicationAn attended terminal, or one gated cabinet

The questionnaire still applies — every store needs a scope before it can be built. What changes is how much scope there is: one point, one application, a defined item list. Less to specify, and quicker to stand up.

A whole site

acuitystore® SITE

Two to twelve pointsMixed formats · one or two applications

The design centre. Formats chosen per item, inspection regimes where items must be in date, and a real choice about whose balance sheet the equipment sits on.

A time-boxed window

acuitystore® CAMPAIGN

Up for the window, gone by handoverRented for the window · mobilised and demobilised to your dates

A turnaround or shutdown store. Mobilised, controlled through the window, demobilised and reconciled against the scope. How a campaign runs →

What the first installation involves

A defined scope, built to a known method.

One controlled point: an attended terminal with scanner and label printer, or a single gated cabinet. It is a standard unit — the same one that sits on the counter of an attended Toolstore and the same one that goes out to a campaign store — so it is built to a known method and held in the finished-goods buffer rather than made to order.

What you have when it is running
A record of one storeEvery issue, return and restock against a person, an item and a point, from the first transaction.
Your people enrolledPeople and credentials loaded during set-up, however they identify at the point.
An item master you ownBuilt with you from whatever you have now. Machine-readable, and yours.
Reporting from the startConsumption by person, crew, job and cost centre, with the exceptions on the same report as the successes.
A record that keeps writingPoints and mobile peripherals hold a local copy and reconcile when the link returns.

Nothing about the second point is different. Same platform, same contract, same reporting — you add a point, not a system.

What you can expect

A well-developed, structured process.

What you can count onWhat holds it up
A figure built the same way every timePackage, configuration template, standard lead time and approval tier are all determined by rule from what you tell us, so the answer is the same whoever you speak to and whenever you ask.
A date we can build toA defined range with known configurations, a fixed build method for each, and a finished-goods buffer on the entry formats.
A clock that starts when you are readyThe standard lead time runs from your signed readiness confirmation, not from your purchase order — because a purchase order does not make a site ready.
A path for the unusualAnything outside the catalogue is a logged Non-Standard Request, priced once. When the same request appears three times, it enters the catalogue.
A short document to signTerms once, then a Schedule per site carrying scope, dates and amounts. The structure →
From enquiry to live

Six steps.

StepWhat happensHow long
1 · QuestionnaireSeven short sections. The three drivers size the store.short
2 · Indicative figureWe size it and come back with a figure and a shape.
3 · Scoping reviewShort, no obligation. Confirms the figure and the readiness answers.45 min
4 · OrderAn Installation Schedule — scope, dates and amounts.
5 · ReadinessYou confirm the site is ready. The clock starts here.
6 · LiveBuilt, configured, delivered, commissioned, Certificate of Completion issued.
The next step

Start with the step in front of you.

Every one of these grows into the next without a new platform, a new contract or a migration.

Give us the details Ways to begin
Call1300 850 563